Installation Workflow
The Level Up 4-Step System
01
02
03
04
Slide Clip
Insert Wedge
Clamp Tight
Kick Off
Position the Level Up clip under the tile edge, ensuring the base is flush with the subfloor.
Slide the reusable orange wedge into the clip until both tiles are perfectly flush.
Use Level Up pliers to apply precise, consistent tension, locking the wedge firmly in place.
Once cured, simply kick or mallet-strike the clip base for a clean, debris-free break.
Experience Flush Joint Precision
Request a sample pack and discover how Level Up systems can elevate your next large-format porcelain or natural stone project.


